Fleetwood High School

Education

Fleetwood High School was fitted out with a full BEMS system provided by JBC Control Systems Ltd. The site contains a large central BEMS control panel controlling the primary heating and ventilation plant with small remote panels providing control of the secondary Under Floor Heating systems.

The school is a modern building which is zoned with BEMS providing individual temperature and time control of each area allowing the users to select which areas of the school are heated for after school activities, concerts and sporting events.

The temperature of every classroom and corridor is monitored and controlled from the BEMS. Both an on-site supervisor PC and remote off site connection allow the user to monitor and control the system to suit their needs.